This is not a kit, there are no instructions, history, pictures or
diagrams. It is a sheet of etched parts by the late Carl Legg and
represents a set of parts for the scratch builder.
They
arrived from CPL Products carefully packed between two large sheets of
hardboard. Even the rather poor picture here illustrates well the standard
of the draughtsmanship and etching. Fortunately, John Lewis's book GWR
Official Drawings No 3 contains detailed information about this very vehicle
with excellent photographs and 7mm scale drawings. Further pictures are in
various Russell books as well. There is also the remains of an all third
awaiting restoration at Didcot. the last surviving example of a
Dreadnought so far as I am
aware.Exactly how it will go together was then yet to be figured out but I have made a start in taking the parts from the sheet and cleaning them up. In my usual fashion, as much will be done as possible "in the flat" before any assembly is begun. The standard of the etches is really first class. The recessed doors in the ends fit into half etched rebates at the edge of the end as you can see on the right hand edge of the end. The fit is perfect and the joint is next to invisible once made.

To
go with it are lots more of Carl's etches for the working corridor
connectors; luggage racks, picture holders and mirrors, etc., to go in each
compartment and a host of lost wax castings. My client wants a fully fitted
interior and the carriage finished in pre "shirt button" livery with just a
little weathering. What a change, so many people seem to want run full
trains of "ex works" vehicles these days.
The
scissors corridor connectors work (in fact 7mm to the foot scale people
could walk through them if one uses the other the paper inserts provided)
and I have shewn the unassembled one with the cross arms in different
positions to illustrate the point. Not nearly as fiddly as one might think
and, unlike the coach etches, are available as a set, together with
instructions, from CPL. It will also make up into the later suspended
version and, the instructions claim, produce an LNER type too. Beautifully
etched and relatively easy to construct.
Back to top
Fit
as much as possible while the parts are in the flat so, all the bolection
moldings and drop lights are next. Then form the tumbleholme. I used a
long length of brass rod and my fingers. Check constantly against one of
the compartment sides until it is a reasonable fit. Fitting the compartment
sides will then be far easier. This shot shews one side with bolections and
droplights fitted and the other awaiting those parts.I found that if the centre doors are fitted early on, they strengthen the sides at a point that is particularly delicate and therefore, a potential area for serious damage.

The
centre doors have to be folded with the fold lines to the outside and they
can then be soldered into the doorway. Ensure that they are central. Once
soldered up they will also hold the tumbleholme for the fitting of the
compartment partitions. As with so many parts, fit all you can while it is
in the flat, so hinges and door handles should be in place before fitting
the door. The hinges are particularly fiddly, good thing there are only 6
doors. It would have been a good idea at this stage to have fitted the
commode handles too.
The
corridor crossed over between the first and third class compartments
(indeed, crossover corridors were a feature of the Dreadnought compartment
stock). Some care is required because most of the outside of the corridor
side of each partition is about a millimetre thick. However, getting them
square and level is not difficult. Solder the straight section first then,
holding it against the bench on the curve, solder in the tumbleholme.
Lastly, bend in the top by holding it tight against the bench and solder in
the top curve. Fix them all on one side first, soldering them from the
middle outwards. Once you are happy that they are square and level, solder
on the other side, again, from, the middle outward.
Back to topMake very sure that when the second side is soldered up, it is dead square with the first side or the end vestibules will not fit correctly.
The
next shot shews the corridor side as far as the centre vestibule. There is
little material on the corridor side as you can see so care is required. On
the whole though it is not a difficult job. So far as I am aware, Carl
designed these etches for his own use and I assume he intended the whole
thing to be as easy as possible commensurate with producing an accurate
model. So the fiddly hinges came as a surprise, he must have had really
good eyesight and nimble fingers.
The
vestibules. One fitted and the other awaiting fitting to the other end.
The parts fit virtually perfectly, all one needs to do is ensure that they
are soldered on a flat base and checked for square.Next will be the under frame, which may prove "interesting" and then I shall concentrate on the compartment fittings. Back to top


THE
UNDER FRAME. The time had come to start on the under frame but I discovered
that the sole bar etch is too long by a scale 16". These two pictures
illustrate it well. Since I had not linked the word "errors" with the name
Carl Legg, this was somewhat confusing but, careful examination of the
drawing in John Lewis's book identified where the error was.
All the spacing's for the cross beams, as shewn by the bolt heads, were spot
on except for those where the bogie centre line was. It looks as though the
8" beam that is fitted there on the real thing was been allowed for twice at
each end. It was simple enough to cut out a piece of the sole bar and join
it up again at the etch line beside the bolt heads. For the sole bar beam I
used some lengths of brass channel (Eileen's Emporium, usual disclaimer)
that just takes the etched sole bar overlay. This picture shews one etch
cut, one unmodified and a section of channel.
The under frame parts shewn above have the sole bar etches soldered into the
channels. Construction is relatively easy so long as one keeps the parts
well clamped to a flat, hard, surface, topside down allowing for the
protrusions on the buffer beam. The buffer housing are from the CPL range
and solder into the holes easily. The close-up shot shews how the parts are
fitted together. It is important to start by soldering in the two buffer
beams, ensuring that the frame is absolutely square. It is then an easy
matter to fit the remaining parts by measuring from each end to get the
spacing correct. Cleanliness here is vitally important, since there is not
a large area available for soldering we have perforce to make the best of
what there is.Back to top
THE INTERIOR
The luggage racks and base for pictures and mirrors comes as a very fine set
of etched parts. This picture shews the etched parts and the finished
article ready for fitting inside the compartment. These parts are available
as separate components for a variety of corridor and non-corridor stock.
There are enough parts in the left of this picture to make up the backing
and luggage racks for one compartment. For the compartments in this
carriage, multiply by eight. Soldering the parts together is made easier
with an RSU and solder cream, I think using a soldering iron would be quite
difficult, but no doubt someone will tell me otherwise in due course. The
arms for the rack are tiny and the mesh very delicate. Is it tedious? yes.
Is it worth it? definitely.
The inside is now beginning to look a little like a series of compartments.
The seats will be added later. The compartment side comes as a single etch
each for the first and third class sections but would not fit as single
items.
I cut each compartment side to size and soldered them in prior to
soldering in the luggage racks, mirror and picture frames. It needs care to
ensure that they all line up so that the corridor side does not look like a
dog's leg.
Now for some detailing. Here you can see the lost wax brass commode handles
fitted. There are far more on the sprue than this carriage needs, the
others being intended for the brake. The one on the vestibule door fits
perfectly but for the centre door the holes are not correct.
Back to top

THE
SEATS. I had a choice of
Blacksmith or
Slater's for the seats and chose the
latter because there re add-on parts to make the arm rests needed for first
class. Here are a couple of compartments worth. Simple plastic moldings,
all they need is trimming to fit the compartment. I still have to cut one
of the arm rests in half to fit. The third class use the same basic
molding but the seat is a good deal less deep and there are no arm rests.
Next job is to fit all the seats in the compartments.The seats were glued in, I tried Loctite 480 but of course it has no "grab" so used UHU, which gave plenty of time to adjust the seat in their correct positions.
BOGIES. A start was made next on the bogies for which I am using Carl's fully sprung units. These come as a separate kit together with excellent and comprehensive instructions. They look complicated but in fact are quite simple to put together. You do however need some piano wire of different gauges for the springs. The units are designed for cosmetic side frames to be fixed to them and the wheels run in inside bearings.

This is the basis on which the whole system works. The slots allow one to
produce bogies with a wheel base between 6 to 11 foot centres in 6 inch
increments. There is a way to allow for 3 inch increments too.Most of the parts have been assembled on the basic frame with some temporary guitar wire as the first set of springs in until my order from Eileen's arrives. The horseshoe shaped fitting on top are the locating holes for the bolster springs. Back to top
The same unit upside down with the wheels temporarily dropped in. The two bolt heads hold the clamping plate for the wheels springs.



Right side up with the wheels in temporarily. The next shot shews how the
wheel units are constructed while the other illustrates an almost completed
bogie ready for the cosmetic side frames to be fitted.
The completed bogie ready for fitting to the under frame. The bolster plate
is loose and is fitted on the bogie pin so that the bolster springs
operate. Height is adjusted via a toothed device that fits above this on
the pin as shewn in this picture. The whole bogie is held in place by an
8BA nut. Back to
top
A bogie fitted to the under frame. The first without side frames to
illustrate how the parts go together and the piano wire springs. The second
completed and awaiting the body (to push the axles boxes down) and painting.
THE
BRAKE TELL TALE. The Tell tale comes as a very fine set of lost wax
castings on a single sprue thus:This is one set of parts that should have been fitted before the ends were soldered to the body. Poor planning, they are not easy to fit to the body after it has been constructed.

The sprue arrives with a 7mm scale drawing of the end of a Dreadnought,
which helps greatly in establishing just where the parts go on the end. The
advice is to assemble the part before fitting the whole to the ends. Sound
advice, I set them up on the drawing on the RSU plate, making sure that
there was some direct contact and soldered them easily. Here is the
completed unit ready for fixing to the coach end.
While fitting to the end was more difficult than it ought to have been, it
was not impossible.

The body needs fixing points fitting so that the under frame can be bolted
to it. There are a number of points where this can be done but the
important ones are the ends and the centre. This is one of those jobs that
ought to have been completed before fitting the interior, poor planning
again. However, to ensure that there are firm fixing points at the ends I
soldered in, from inside of the vestibule, a piece of brass bar 19x4.5mm
section, 51.9mm long. Next the under frame was offered up the holes for one
end marked. The holes were drilled and tapped 8BA. Next the under frame
was bolted to this end and the other was marked up before drilling and
tapping. This gives a secure fixing but the centre needs fixing points too
to prevent it bowing and leaving an unsightly gap.
A piece of brass strip was soldered across the centre as here. The under
frame fixed in place again and the holes marked up and drilled for 8BA
clearance. A simple matter then to bolt a couple of 8BA nuts in place with
a little oil in the thread and solder them to the inside. I had to remove
the seat to do this and to cut away part of the front support to clear but
it will be invisible once the seat is re-fitted.
Back to top
One important part that is not available from CPL are the queen posts.
George Pring used to do a nice set of this type (I used some to convert a
Connoisseur
Macaw to a Diagram J11 a couple of years ago) but they seem
unobtainable now from Graham Bone who took them over.
The beautiful brass
castings shewn here are from Ian Young (Sanspariel, usual disclaimer.) based
on masters made by David Sweetland. The lower part of each post has a cast
nut and is threaded 12BA; so needs only cleaning up with a die and a 12BA
nut fitting.The trussing needs careful handling. Firstly each piece had its cusps filed off to give neat, square edges. I then polished the whole truss with a No:4 cut file. The etched holes for the queen posts need to be opened out with a taper broach and it would be easy severely to damage them so care is needed here also. Once the holes were the right size, the raised edges were filed flat again. I put the twists in following the drawing, taking care that they are all in the same place and the same length. The position of the centre of the twist is marked on the truss and two pairs of pliers held close and equidistant from the mark. It is then a matter of gently twisting through a right angle.
Again, using the drawing, I put the bends in; taking care that the bend does
not come at the hole, there should be a distinct gap between the hole and
the bend.
The outer trusses were then bolted to the queen posts. Using this sub
assembly it is then an easy matter to line it up on the frames and solder in
place.
Here the queen posts are in place with all trusses fixed and waiting to be
cleaned up. The brake gear has also been fitted with the pull rod being
fixed to the base of the bolster plate. One of the nuts had to be soldered
but the rest are simply bolted. The excess thread is then cut off and filed
flat. Back to top
The gas cylinders were made up from brass tube with ends soldered on and
filed to shape. The straps were fitted and then a piece of brass bar 4x2mm
section was soldered into the straps. The whole unit was soldered to the
chassis by the brass bar, which holds the cylinder at the right depth for
the sole bar.
The footsteps were made from 5x1mm brass strip filed down to 4.5mm wide, cut
to length and then one side and two ends were rounded off to represent the
thick wooden steps that were fitted to these vehicles.
The fixing holes in the sole bar were drilled out 0.7mm and small lengths of
0.7mm rod were soldered in and cut down to project no more than 4mm.The flat side of the step was smoothed off, solder cream very sparingly applied to it and the wire supports and then soldered in place. Relatively simple since there are only six steps. The chassis is now completed. However, the buffers heads will have to be changed for the round type. Though built with oval buffers, they had been modified by the 1920's.
THE ROOF
This has been a problem. My original idea to use a tinplate roof did not work so I used the Blacksmith made to measure roof in brass. Keeping it to the right shape along its length requires a number of formers to the exact profile of the roof as in this picture:
The two end formers have been modified to clear the back of the steps on
each end. The intention being that the end formers are to be a tight fit
with the ends. On reflection, it may have been a good idea to have cut the
tops off some of the compartment partitions before basic construction
started and used those. If I do any more of these carriages I will certainly
experiment with the idea.
The next picture shews one of them fitted 2mm from the end of the roof, to
allow for the overhang and fit as a sliding fit inside the ends. The roof
must also be the right way round so that the ventilators match up with the
first and third class compartments.
The remainder of the formers were fitted at intervals along the roof after
the holes were drilled for the ventilators but before fitting them to ensure
one does not foul the other. In fact the formers were all put close to
compartment sides to hide them. When originally built there were two rows
of ventilators down the roof but later pictures shew only one ventilator
over each compartment off centre. So far as I can tell from pictures in
Russell, the ventilator for the lavatory was on the centre line of the
roof. Still to be fitted are the water tank tops and rain strips. The roof
fits quite well but still needed some form of fixing to keep it tight
against the sides. Here is how I achieved it (making it all up as I went
along of course!).
A "U" shaped piece of brass holds an 8BA nut soldered to its inside. This
is in turn soldered into the roof. A length of brass rod was then threaded
8BA at both ends. One end is fitted into the roof mounting plate and fixed
with nutlock. Back
to topThe other end is bolted to the under frame using a piece of loose fitted flat brass. This allows for some adjustment and flexing.
Not the greatest piece of engineering but it works. It was not possible to hide the rod inside the lavatories unfortunately because they needed to be on the centre line but, suitably painted, it will be practically invisible in the vestibule.
You can see here that there is a floor fitted. 2 pieces of plasticard either side of the centre under frame member. They are tucked into the side turn-under and so can be removed.

All that remains to be done is fit the cantrail and the rain strips but that
cannot happen until Eileen's return from their long summer break as I have
nothing long enough in stock for the job. Automatic couplings also have to
be fitted (which is why the screw couplings have disappeared). Then it will
be off to Dennis Morley's paint shop. After that, there will be lighting,
glazing, pictures and mirrors to fit before delivering to my customer at
Telford 2007.It has now returned from the painters and I am working on fitting the windows and lights.
With the lights on.Back to top
So what has been learned from this exercise?
The compartment partitions need to be cut down significantly before assembly if lights are to be fitted and the cut-offs used to make formers for the roof, with suitable shapes worked into their inside edges to allow for the light fittings. The corridor connectors ought not to be fitted as part of the basic shell but painted separately and fitted after the body is painted, this allows for the bellows and top shroud to be fitted accurately. The cantrail must be fitted as part of the "in-the-flat" construction of the sides to ensure that the soldering is really strong. Better planning to allow for batteries and charging points to be established. Experiment with other bogies that do not have knife edge bearings. Considerable thought should be given to finding some way to make the interior extractable for ease of painting and fitting, though I suspect this is wishful thinking. The buffer housing stops should not be bent up or the springs fitted until after painting. It may be necessary to use more than one LED for compartments since these modern carriages had better lighting than earlier vehicles. Fit all commode handles, door handles and brake telltale before assembly. Plan how the underframe, body and roof will be fixed more carefully. Fit a brass floor, not plasticard.
List of parts and materials used:
Etches: Dreadnought etches for sides, corridor partition, ends and underframe; mirrors, bogies, corridor connectors, compartment interiors, destination board holders.
Lost wax castings: Square shank buffers; Brake telltale; Dreadnought commode handles; Door knobs; Steam pipes; Vacuum pipes, Queen posts. Springs and 10BA nuts for the buffers.
White metal castings: Vacuum cylinders, bogie side frames, roof vents.
Maunsell wheels; coach seating; arm rests, brass roof section.
8 & 10BA nuts and bolts; brass sheet, strip, channel, wire, tube and rod; piano wire, lighting kit, plasticard. Back to top